Looking downstream at the BWP the safe passage for floaters is on the left, the four surf features are in the center and a wildlife preserve is on the right.  We are looking at the end of August or early September for opening to the public.  The lower construction bridge needs to be removed and park landscaping finished.  All four surf features are bladder controlled and there are also diverters controlling the flow into each channel.  This will all be computer controlled and the Bend Parks and Recreation Department is recruiting for a River Recreational Specialist (Wave Master) to oversee all park operations and maintenance.  This posting ends on 7/6 and can be found at their website  http://www.bendparksandrec.org/info/About_Us/employment/Job_Openings/.