WW-Play-Park-by-David-kinker

Water is flowing in the Whitewater Channel! Hamilton Construction crews seal the bottom of the pool below Eddie’s wave and are prepping to build the safe passage drops. The waves should be open before summer’s end, so plan on visiting us in sunny Bend, Oregon September 19th for the kickoff party.

A user's photo.